Blog

News of the sector

Improvements in Premium Club Gran Café, Almería

Today we start with a new one-of-a-kind-installation intervention in the premise of one of our costumers in the catering industry. On this ocassion, we are going to do an improvement in the air conditioning system in this premise, with the singularity of the equipments, the new ones and the old ones because of their dimensions, can not be carried to their place by the existing holes in the premise and we have had to make an opening hole in the facade.

This type of works requires a rapid action and well timed planning, to interrupt as less as we can in the normal functioning of the premise. We are changing two equipments of 28 kw each one of Hitecsa brand, for Hitecta machines, but more efficient and with them we can reduce the consumption.

From JOFER we have looked for the best option to do this intervention because we do not want that our costumer can experience annoyances during the everyday functioning of their premise.

Another intervention that for sure we are going to finish with success for Premium Club Gran Café.

Utilizamos cookies propias y de terceros para mejorar nuestros servicios mediante el análisis de sus hábitos de navegación. Si continua navegando, consideramos que acepta su uso. Puede cambiar la configuración u obtener más información aquí. ACEPTAR
Aviso de cookies