(Español) Burger King Algeciras
Sorry, this entry is only available in European Spanish.
(Español) Piscina cubierta Envía Golf
Sorry, this entry is only available in European Spanish.
JOFER office
Installation of an aerothermal to provide sanitary hot water, hot water for the radiant floor installation, air conditioning cold/hot through two ducts... Learn More
Full maintenance of the Empresas Participadas de Cajamar Building
Full maintencance of the building offering the air conditioning, ventilation, electricity, and mixed trades services such as automatism, locksmiths, plumbering, painting and... Learn More
Execution of facilities Burger King Roquetas de Mar
System installation with 2 VRV multi water with LG heat recovery for the climate, enthalpy recuperator for ventilation and 2 hydrokit for... Learn More
Heating and cooling system in dental office
Heating and cooling installation using ducting and a heat recovery system.
Boiler installation for radiator heating system
Installation of combination boiler system with multi layerede pipe distribution and radiator heating.
Preventive Maintenance UAL Building
Preventive and corrective maintenance of electrical system, lighting, heating and cooling, control system, and geral facilities. This building has a VRV system... Learn More
Heating and Cooling System
HVAC installation, along with laboratory cold rooms for food analysis.