Blog

News of the sector

19 Post Offices in Andalusia

In JOFER HVAC Engineering & Services we are immersed in the work of replacing the air conditioning and ventilation of 19 Post offices with Ferrovial throughout the Andalusian geography.

At the moment we have already passed the equator of the project having finished the work in the offices of Conil de la Frontera (Cádiz), Bujalance (Córdoba), Fuente Obejuna (Córdoba), Isla Cristina (Huelva), Control Room (Huelva), Torrox (Málaga), Albox (Almería) and Mijas (Málaga). Currently we are doing our work in the office of Algeciras (Cádiz) which is one of the largest area with 2923 square meters and Huelva.

We are replacing existing equipment with Hitachi VRV systems, combining duct systems with cassette according to the needs of each zone. When the heat recovery system is installed to the ventilation system, according to the needs of each office and area.

In addition to the air conditioning and ventilation work, we are also carrying out the plumbing, electricity and masonry work, as these are “turnkey” projects. JOFER is responsible for the entire process, including the drafting of the project in those offices where We exceed 70Kw of installed cooling capacity.

From our production department they are responsible for managing all the necessary procedures to be able to carry out the works and coordinate with the different offices to execute the works having the lowest possible impact on the normal operation of the offices.

We continue to work so as not to deviate from the planning agreed with Ferrovial and Correos so that all the work will be completed on the scheduled dates as yet.

Utilizamos cookies propias y de terceros para mejorar nuestros servicios mediante el análisis de sus hábitos de navegación. Si continua navegando, consideramos que acepta su uso. Puede cambiar la configuración u obtener más información aquí. ACEPTAR
Aviso de cookies